在线午夜_天天影视综合网色综合国产_国产亚洲第一页_日操夜操天天操_日本久久综合视频_综合97

行業(yè)資訊

DHK型快速環(huán)鏈電動葫蘆,使用規(guī)則

DHK型快速環(huán)鏈電動葫蘆 ,使用規(guī)則。適用場所設(shè)備制造、生產(chǎn)加工、倉儲物流、船塢碼頭等。

快速環(huán)鏈電動葫蘆

1、使用前必須對吊鉤、鏈條、吊銷等部件進(jìn)行檢查,確認(rèn)機(jī)件完好無損后,方可使用。

2、使用時(shí),必須確認(rèn)被提升物不得超過產(chǎn)品額定起重量,也不能用兩臺產(chǎn)品同時(shí)提升一件物品。

3、提升重物前,起重鏈條應(yīng)自然垂直懸掛,不得斜吊,雙行起重鏈條產(chǎn)品,下吊鉤嚴(yán)禁在兩行鏈中翻轉(zhuǎn),重物提升高度不得超過額定起重高度。

4、提升重物時(shí),嚴(yán)禁工作人員在重物下面做任何工作或行走。

5、電源電壓,頻率必須符合銘牌上面的規(guī)定,在額定功率下,電壓不得低于額定值的90%。

6、產(chǎn)品應(yīng)避免雨淋,也不適合于提升有毒、有腐蝕、高溫高壓、易燃易爆的物品,工作環(huán)境應(yīng)符合:溫度-25℃+40℃,濕度<90°。

7、產(chǎn)品當(dāng)用于腳手架整體提升時(shí),應(yīng)有專人安裝、操作,懸掛結(jié)束后,應(yīng)由空載試運(yùn)行,檢查各連接件、起重鏈、吊鉤等有無異常,確認(rèn)完好后在使用。掛架前應(yīng)調(diào)整起重鏈條的長度,使掛架后每臺電動葫蘆的起重鏈條的張緊度一致,提升時(shí),應(yīng)有專人觀察每臺產(chǎn)品,查看腳手架是否與墻體相碰。提升機(jī)是否有異常聲音或卡鏈,發(fā)現(xiàn)異常應(yīng)立即停機(jī)檢查,排除故障后,方可使用。

DHK type fast chain electric hoist, rules of use

1. Before use, check the hook, chain, revocation and other parts, and confirm that the parts are intact before use.

2. When using, it must be confirmed that the lifting object shall not exceed the rated lifting weight of the product, and it is not allowed to lift one object with two products at the same time.

3. Before lifting heavy objects, the lifting chain shall be naturally suspended vertically without inclined lifting. Double row lifting chain products are prohibited.

4. When lifting heavy objects, it is strictly prohibited for staff to do any work or walk under the heavy objects.

5. The power supply voltage and frequency must meet the requirements specified on the nameplate, and the voltage shall not be lower than 90% of the rated value at the rated power.

6, the product should avoid the rain, also not suitable for ascension toxic, corrosion, high temperature and high pressure, inflammable and explosive items, work environment should meet: temperature 25 ℃ + 40 ℃, humidity < 90 °.

7. When the product is used for the overall hoisting of the scaffold, it shall be installed and operated by a special person. After the suspension, it shall be carried out no-load test run to check whether there is any abnormality in the connecting parts, lifting chain and lifting hook, etc., and it shall be put into use after being confirmed intact. The length of lifting chain shall be adjusted before the hanger to make the tension of lifting chain of each electric hoist behind the hanger consistent. When lifting, special personnel shall observe each product to check whether the scaffold touches the wall. If there is any abnormal sound or card chain in the elevator, stop the machine to check if there is any abnormal sound or card chain.




主站蜘蛛池模板: 色999视频 | 九九精品视频在线 | 亚洲丁香色婷婷综合欲色啪 | 欧美整片在线观看 | 亚洲性人人天天夜夜摸 | 亚洲污视频 | 激情五月色婷婷色综合 | 国产成人性毛片 | 欧美在线看欧美高清视频免费 | 国产美女主播一级成人毛片 | 美女内射毛片在线看免费人动物 | 亚洲精品在线视频 | 欧美日韩国产片 | 国产在线视频网站 | 中文字幕国产视频 | 日日拍夜夜操 | 精品国产一区二区三区四 | 一本大道在线观看 | 亚洲国产精品视频在线观看 | 久久久国产精品入口麻豆 | 一本色道久久爱88av | 狠狠的操 | 久草精品在线观看 | 清清草视频在线 | www.夜色| 青青青国产免费手机视频在线观看 | 欧美区一区二 | 国产成人精品二区 | 每日更新av | 久草91 | 亚洲狠狠婷婷综合久久久图片 | 亚洲精品一区二区久久这里 | 亚洲色视频在线播放网站 | 男人天堂色男人 | 日本午夜片成年www 一区二区国产精品 | 欧美狠狠插 | 日日摸夜夜爽夜夜爽出水 | 成人区视频爽爽爽爽爽 | 精品九九| 视频一区二区三区中文字幕 | 亚洲激情一区 |